Abutment Rebar:
Heavy reinforcing went in at each abutment. Check out the #11 at the nosing.
Casting Girders:
Pre-pour rebar inspection @ Bexar Concrete for the 100’ I-Girders.
Setting Girders:
Austin Crane Service helped us set the I-Girders in place. The clearances on each end were absolutely perfect.
Overhang Brackets:
Starting the Overhang Bracket install that will allow for the deck forms to be constructed.
Pouring Deck:
Another beautiful day, and lots of concrete poured!!